Tuesday, May 27, 2008

May 27, 2008

We have made a lot of progress since the last posting.








The chassis is on the ground for the first time.





We finally removed the engine and rear suspension from what was left of the MR2







Matt with the Positioning Jig he just built. He put steel up to the MR2 chassis critical engine and suspension mounting points. Then he welded the steel and drilled holes to match those on the MR2 chassis. We will use this jig to assure that our rear engine and suspension support structures and accurate and will fit the engine and suspension.













Rear structure being built over Positioning Jig